FUNCTION 04 · QUANTITY INTELLIGENCE

Room-to-BOM & Construction Intelligence

Start with the information you have. These three tools work without creating, selecting or opening a VKAI project. Measurements, assumptions and missing rates stay visible rather than being silently invented.

INPUTS
→ ANALYSIS
→
REVIEW
OUTPUT
FUNCTION 04 · THREE STANDALONE TOOLS

Choose the work, not a project

You can begin with room dimensions, a construction reference image or supplier prices. Sign-in and V Coin requirements are shown only for actions that need them.

04.0 · QUANTITIES

Room-to-BOM

Calculate room-wise floor, wall and ceiling quantities, enter measured wall heights, apply a visible wastage allowance and download a worksheet. Unknown quantities and unpriced lines remain unknown.

Start Room-to-BOM →
04.1 · REFERENCE ANALYSIS

Reference Image → Construction Breakdown

Identify visible components, likely material families and assembly layers from a reference image. Visual candidates are clearly separated from measured facts.

Analyze a reference image →
04.2 · LOCAL PRICING

Local Material Price Brain

Check available exact-market rates and compare manual supplier quotations. Missing, stale or mismatched rates are not replaced with guessed prices.

Compare local material prices →
OUTPUT RULES

Transparent quantities, assumptions and prices

Measured vs. assumed

Dimensions supplied by you remain distinct from inferred or unavailable values.

Unknown is not zero

A missing wall height, material rate or supplier price stays unpriced until verified.

Save separately

Saved project workspaces remain available from Projects and the relevant project page. They are not a gate to these tools.